Size
625 SQM
Property Type
Office
Level
4
Available
Now
Property Details
This property provides exceptional accessibility for both staff and visitors, with proximity to key amenities including transport routes, retail options, and the scenic Wellington waterfront. All levels enjoy close proximity to the street, offering abundant natural light and captivating views, thanks to the spacious surroundings of Harris St and Jervois Quay. Moreover, it offers secure bike parking facilities and features an electronic access control system, including Gallagher and Integrity access systems. With a robust seismic rating of 100% NBS IL2, this property ensures a well-rounded and secure environment for various businesses and organisations.
All floors come with modern fit-outs reducing the cost significantly for the incoming Tenant
Easy access for Staff and visitors.
700m to Wellington Train Station
160m to the intersection of Lambton Quay and Willis Street.
Centrally located between the Government precinct, the CBD, the civic precinct, Cuba precinct, and the Wellington waterfront.
Good amenities for staff to transport routes, retail, and the Wellington waterfront.
All levels benefit from being close to the street. The width of Harris St and Jervois Quay ensures a good separation from surrounding buildings allowing good natural light and views.
Facilities
3 x Lifts
2 x Stair Access
Carpet tiles throughout the property
Mens toilet facilities with tiled flooring are provided on each floor containing 2 cubicles, 1 urinal, 1 shower and change facility, 1 hand basin, and a cleaners cupboard
Female toilet facilities with tiled flooring are provided on each floor containing 3 cubicles, 1 shower and change facility, 2 hand basins
Ground floor disabled toilet and separate disabled shower facility, with tiled flooring.
Bike parking facilities are provided on the ground floor rear area (Jervois Quay side of the building) with currently 33 hooks for hanging bikes. There is space for more hooks.
Access and Security
Electronic access control system. Gallagher and Integrity access system.
CCTV (HD colour) cameras will provide coverage of entrances to the main GF office lobby.
Bi Lock Key System
Seismic
100% NBS IL2
Seismic upgrade works were completed in March 2017 to achieve 100% NBS (IL2) by Beca